Before Starlink existed, a remote Western Australian mine site was stuck on a 2 Mbps/2 Mbps satellite link. Panda IT designed and built a six-hop solar-powered microwave network to a Tom Price business with a 100 Mbps fibre connection, connecting the mine to its head office at real broadband speeds. A major telco quoted $4.6 million to run fibre; the microwave solution was built for $69,000, excluding the existing Tom Price connection supplied by the mining company.

Key results

100 Mbps
connection to head office
$69,000
network build cost
6 hops
solar-powered relay sites
Cyclone rated
towers, mounts and enclosures

The challenge

  • The remote mine relied on a 2 Mbps/2 Mbps satellite link with high latency and poor reliability.
  • A major telco quoted $4.6 million for a dedicated fibre run.
  • No commercial power was available at the relay sites across the six-hop path.
  • Extreme heat, dust and cyclone exposure shaped the Pilbara installation.

The solution & results

  • Surveyed the terrain and designed a six-hop microwave path to existing fibre in Tom Price.
  • Built solar-powered relay sites with cyclone-rated towers, mounts and enclosures.
  • Delivered a 100 Mbps connection to head office.
  • Completed the network build for $69,000, excluding the existing Tom Price connection.

“For the first time we could run our mine systems, video calls and file transfers like a real office. The satellite days felt like a different century.”

Mine operations manager, Western Australia